SHOREBASE

Odoo - Sample 1 for three columns

KOSMOS

  • Demobilize Kosmos Storage Yard in Sosa Yard Chaguaramas

  • Truck pipes from Sosa Yard to Caridock Port

    Operations ran from January 4th to January 6th with 24 hour continuous operations

  • Each shift was 12 hours long

  • Vessel was cleared and made its journey to Fourchon USA

  • Load out 470 joints of pipe


Odoo - Sample 3 for three columns

EXXON

  • Inside Scoop: May get news of a find in the UARU well in Guyana from the Noble Tom Madden drillship. This is based on the type of tools the rig has requested (Shhhh! Don’t Tell anyone!)
  • New additions to team – 1 HSE & 2 Logistics Coordinators.


Fun Fact: 

16 vessels for the project and 8 – 10 operate in Trinidad through Chagterms



NALCO CHAMPION

  • Operations began on Jan 6th in preparation of bulk chemical load outs onto the Guyana Hero vessel working for Exxon Mobil.

  • The Chemicals can be loaded via tote tanks or via a special pumping trailer which Ramps imported for Nalco.

  • First Chemical Bulk Loadout via pumping trailer was carded for Jan 15th at Chagterms Base. The trailer was escorted via Police escort from ChagBase 2 (Formerly known as Interisle) to ChagBase 1.

  • Unfortunately, there were mechanical issues with the trailer that did not allow for the bulk transfer from the Shore Tanks to the Vessel Tanks. #FailureWithThePumpingTrailer

Odoo • Text and Image
Odoo • Text and Image
Odoo • Text and Image
Odoo • Text and Image